12 Things You Need To Do To Get Ready For A Roof Replacement In Belmont, MA

Is Your Roof Getting Old? Follow These Steps To Prepare For A Roof Replacement

Exterior remodeling can be a real headache. From dealing with aggressive salespeople to having your home torn up, the whole process can really get you down. When your Belmont home’s roof gets old or shows signs of damage, there’s no way around it. 

You NEED to get it replaced. Following these 12 steps for preparing for a roof replacement can make the whole experience go a whole lot more smoothly.

1. Confirm That You Really Need A Full Roof Replacement

If you have a leak, it does not necessarily mean you need to have your entire roof replaced. The same goes for a few missing shingles. 

The first thing you need to do is have an evaluation done by your local roofing contractor. They will be able to tell you the extent of the damage and if you truly need to have the entire roof replaced.

If your roof was properly installed, it should last until right around the manufacturer’s specified life span. This means a leak may only need a simple repair.

So before you make any decisions, get a full inspection.

2. Hire A Local Contractor

Hiring locally is crucial to a successful remodel. You’ll want your contractor to have a local office with a phone number listed so that you know exactly where and how to get in contact with them should something go wrong with your roof.

Additionally, if they’re local, they’ll know everything that needs to be done in the process of installing a new roof. They’ll know the local codes to follow, if there’s any special paperwork required, everything the state requires, and what kind of roof best suits the needs of the environment you live in.

3. Choose High-Quality Materials

Like any other major investment, your roof won’t come cheap. However, you should not skimp on the expense of what materials you buy. Make sure you invest in the best materials for your roof.

Cheaper materials and labor will result in a lower-quality finished product. In the long run, this will cost you more money because you will have to invest in more repairs down the road.

4. Find Out What Materials Are Required For Your Roof Replacement

Just because you’re getting your roof replaced doesn’t mean that all the materials on your roof will need to be replaced. Make sure you find out from your contractor exactly what needs to be replaced before you invest your money and time.

5. Remove Your Wall Decorations

If you have anything fragile on your walls, you’ll want to take it down before repairs start. The vibrations from the roof may travel down your walls and knock your decorations off. This can cause some serious damage to your precious items.

6. Don’t Park In The Driveway

Giving up your parking spot may be necessary. It will allow your contractors easier access to unload their tools next to the house. This will also keep your vehicle safe from accidental damage. 

7. Consider Your Kids And Pets

A roof replacement can be an overwhelming experience for kids and pets. You will have to explain to your children that some areas of the home will be off-limits from time to time while the contractors are working. Additionally, you will have to ensure that your pets stay clear. 

Also, the loud noises from the project may cause them anxiety or stress. If any of this is going to be a problem, you may want to consider having your children and pets stay somewhere else for the duration of the project.

8. Clear The Yard And Patio

You’ll need to clear the patio and the yard for two reasons. First, you want to make sure that the contractors’ work area is clean and safe for them. Second, you don’t want any damage to happen to your patio furniture or other belongings. You will need to store the items or move them to one location out of the way until the project is over. 

9. Protect Your Belongings Stored In The Attic

Because of all the activity on the roof, dust and debris may fall onto your things that are stored in the attic. The best way to protect these items is to cover them with a cloth for the duration of the roof replacement.

10. Identify All Accessible Outlets

Exterior outlets are the best option for your contractors to use while working on your roof. If you don’t have any, they will have to use the ones in the garage. Before they arrive at your house, identify all available outlets that they will be able to use for the project to make it easier and quicker to get started.

11. Prune Your Trees And Cut Your Grass

If you have trees that are close to your roof, you will need to cut them back. The contractors will need unobstructed access to the roof. 

Additionally, you’ll want to cut the grass. If you’re expecting the contractors to clean up after themselves, help make it easier by having the grass trimmed low.

12. Talk To Your Neighbors

As a common courtesy, let your neighbors know there will be construction going on at your house for a few days. This way they can prepare for the disturbances that will affect them, too.

Why You Should Choose Solid State Construction For Your Roof Replacement

Here at Solid State Construction, our customers give us references. If you’d like to speak with one of our past success stories, reach out to us.

We operate on a strict system of Core Values. These values include:

  • Innovation
  • Passion
  • Integrity
  • Professionalism
  • Family
  • Drive
  • Transparency
  • Pride

You can rest assured that we do what’s best for you and not what’s best for our bottom line!